English (United States) English (United Kingdom)
Friday, July 30, 2010
Air Conditioning Assessment Minimize

In additioin to EPC certificates, GSG is also progressing into the next phase of the EPBD delivery....Air Conditioning System Assessment.

Did you know?

In Scotland, To comply with the EPBD, Air Conditioning Assessments are mandatory for systems in excess of 12kW.

GSG utilise the TM44 Inspection and Assessment methodology as laid down by CIBSE in providing all Air Conditioning Assessments.

In Scotland, the timetable for introduction of these assessments is noted below;

  • Systems in excess of 250kW- Must be assessed by 04th January 2011 and the inspections being carried out from 04th January 2009.
  • Systems in excess of 12kW, but less than 250kW-Must be assessed by 04th January 2013 and teh inspections being carried out from 04th January 2011.

The guidance from Scottish Building Standards is that those managing systems in excess of 250kW, should be arranging inspections now.

As with EPCs, the building owner is responsible for the provision of the inspection and assessment and the validity of each assessment can range from 3 to 5 years depending on the recommendations of the report.

Thumbnail

Read more...

 


News Minimize
GSG delighted at seminar attendance
On Tuesday 27th April GSG Energy were delighted to welcome representatives from the private and public sector across Scotland to the Teacher Building, St Enoch Square for a seminar on legislation changes affecting Air Conditioning and the Carbon Reduction Commitment.
 
The seminar took the form of an informal presentation, from GSG Energy Director and CIBSE Air Conditioning Inspector Michael A Gribben, and discussion forum on the new changes to Air Conditioning Systems, which are required to be in place at the start of 2011. The obligations are briefly noted below;
 
As of the 4th January 2011, all air conditioning systems over 250kW will require to have been inspected by an accredited inspector and a report generated as to its efficiency, providing advice on the system and identifying potential savings.
 
As of the 4th January 2013, all air conditioning systems over 12kW will require to have been inspected by an accredited inspector and a report generated as to its efficiency, providing advice on the system and identifying potential savings.
 
A total of 30 people attended, all of whom contributed to a wonderful event that culminated in a review of the Carbon Reduc   

Contact Details
 
Suite 0-9, Titan Enterprise Centre
1 Aurora Avenue
Queens' Quay
Clydebank, G81 1BF
Tel :.0141 951 7866
Fax :. 01236 457 644
Email :. enquiries@gsgenergy.com
 
 
Copyright 2009 by GSG Energy