English (United States) English (United Kingdom)
Monday, February 06, 2012
Air Conditioning Assessment Minimize
 
Air Conditioning Assessment

Editor note: <p>&#160;</p>

In additioin to EPC certificates, GSG is also progressing into the next phase of the EPBD delivery....Air Conditioning System Assessment.

Did you know?

In Scotland, To comply with the EPBD, Air Conditioning Assessments are mandatory for systems in excess of 12kW.

GSG utilise the TM44 Inspection and Assessment methodology as laid down by CIBSE in providing all Air Conditioning Assessments.

In Scotland, the timetable for introduction of these assessments is noted below;

  • Systems in excess of 250kW- Must be assessed by 04th January 2011 and the inspections being carried out from 04th January 2009.
  • Systems in excess of 12kW, but less than 250kW-Must be assessed by 04th January 2013 and teh inspections being carried out from 04th January 2011.

The guidance from Scottish Building Standards is that those managing systems in excess of 250kW, should be arranging inspections now.

As with EPCs, the building owner is responsible for the provision of the inspection and assessment and the validity of each assessment can range from 3 to 5 years depending on the recommendations of the report.

GSG are members of various Air Conditioning Inspection Panels across the UK, thus have the capability to deliver this service wherever the project may be.

http://www.commercialairconditioninginspection.co.uk/

 
 

Print  

GSG News Minimize
Air Conditioning Inspections-New Dedicated GSG Website

GSG are pushing their Air Conditioning Inspection Services, with the introduction of online quote requests on their dedicated air conditioning inspection website, which can be used to request quotations and garner further Air Conditioning Inspection information.


For all required information on Air Conditioning Inspections in Scotland, please visit www.commercialairconinspections.co.uk

 

  

Copyright 2009 by GSG Energy